PVGround

Terrain Analysis

Read the terrain from the drawing; make layout, earthwork and drainage decisions in the same model.

PVGround imports topographic data into AutoCAD and lets you analyze your site before and after panel layout. You see slope limits, elevation differences, water flow directions and cut-fill requirements on a single drawing, and detect risky areas early.

Don't guess the terrain; measure, analyze, then decide on placement.

How it works

  1. 1

    Import topography into the model

    Import elevation data according to your PV Area boundaries. The terrain becomes the shared reference for panel layout and all analyses.

  2. 2

    Check slope and suitability

    East-west and north-south slopes are calculated per panel. Rows exceeding your limits are color-coded on the drawing so you instantly see which areas are unsuitable for placement.

  3. 3

    Test the cut-fill scenario

    Calculate cut and fill volumes, area percentages and panel elevation differences. Compare cost and technical impact before leveling the terrain.

  4. 4

    Analyze drainage behavior

    Model surface flow directions, ponding points and drainage lines. Visually track where rainwater collects on the site and which direction it flows.

  5. 5

    Validate with cross sections and reports

    Check the terrain-panel relationship in profile views and communicate your decisions clearly to the technical team and investors.

Highlights

  • Topographic data import integrated with PV Area
  • Per-panel east-west / north-south slope analysis and limit control
  • Color visualization of limit-exceeded zones
  • Cut-fill volume and area ratio calculation
  • Panel elevation difference and ground clearance tracking
  • Physics-based drainage analysis: flow direction, ponding areas, drainage network
  • Live preview and on-drawing result display
  • Terrain-panel fit check with profile cross sections
  • Ground condition evaluation with pile analysis

Outputs shown on this page

OutputBenefit
  • Slope mapSeparates suitable / risky areas for placement
  • Cut-fill summaryEnables preliminary construction cost estimate
  • Drainage network and flow directionsSupports water management planning
  • Profile cross sectionsValidates panel-terrain relationship
  • Panel elevation dataControls mounting and cleaning height