PVGround

DC-AC-HV Cabling

Plan cable routes according to site geometry; manage DC, AC and HV lines in the same drawing.

After stringing and equipment placement, PVGround automatically creates cable routes along trenchlines (cable trenches). It first draws the routes in the 2D plan view, then moves them into the 3D model using the topography. It produces quantity data per transformer, inverter and string, and provides ready output for the bill of materials and technical checks.

How it works

  1. 1

    Prepare the electrical infrastructure

    Cabling starts once PV Area selection, stringing and device placement (inverter/transformer placement) are complete. The system reads the string-inverter-transformer relationship from the drawing.

  2. 2

    Define the trenchline routes

    Separate trench lines are selected for DC, AC and HV. Burial depth and slack (extra length) values are set separately for each line type.

  3. 3

    Run automatic cabling

    DC: from the string +/− terminals to the trenchline, and from the trenchline to the inverter. AC: from the inverter to the trenchline, and from the trenchline to the transformer. HV: connection between transformers (or to the substation) via the trenchline. In central inverter mode, the middle stage becomes DC Combiner → Central Inverter cabling. On tracker sites, DC cabling uses an algorithm specific to the tracker layout.

  4. 4

    Convert to 3D

    With Convert to 3D, cables and trenchlines are converted into 3D geometry that follows the topography. Panel corridors, burial depths and terrain slope are reflected in the model.

  5. 5

    Quantity takeoff and reporting

    Each cable segment is tagged with metadata (string, inverter, transformer). This data is used in DC/AC quantity analysis, cross-section calculation and project reports.

Highlights

  • DC, AC and HV cables in one model: with separate trenchline layers and color codes
  • Trenchline-based automatic routing: routes that fit the site plan reduce manual drawing work
  • String Inverter and Central Inverter support: AC or DC Combiner flow depending on the system type
  • Fixed-Tilt and Tracker compatibility: separate DC cabling logic for tracker sites
  • Slack and burial depth control: separate parameters for DC, AC and HV
  • 2D → 3D conversion: realistic cable and trench geometry with topography
  • Quantity takeoff with metadata: length tracking per transformer / inverter / string
  • DC corridor creation: cable corridors between panels across the PV Area