PVGround

Shadowing Analysis

See shading losses on the drawing during design and catch them before you commit to changes.

PVGround brings together your panel layout, shading objects and the date/time scenario you choose inside the AutoCAD model. You see which rows are shaded and at what times directly on the drawing, and clarify risky zones before changing row spacing, orientation or obstacle placement.

How it works

  1. 1

    Select your PV Area

    When you mark the site boundary, PVGround automatically includes panel rows, fences, trees, transformer/station, wind turbines and custom shading objects in the analysis. You do not need to select each object one by one.

  2. 2

    Define the critical day and time

    Project coordinates are read from the PV Area. You can run shading for a single moment in time or for a time range (e.g. before and after noon). Ideal for testing production-critical periods such as the winter solstice.

  3. 3

    Read the result on the drawing

    Shaded areas are drawn on the model. Zones intersecting panel rows are highlighted, so you can visually answer whether shading comes from the site itself or from a neighboring row.

  4. 4

    Revise the design and run again

    When row spacing, panel orientation, station/fence position or active area boundary changes, rerun the analysis to compare the impact quickly. Address shading risk during layout, before moving to PVsyst.

Highlights

  • Evaluates on-site and surrounding shading sources together: panel rows, trees, fences, stations, wind turbines and custom shading objects in one scenario.
  • Delivers panel-level visible results: shading is not shown only as a general area; affected rows are clearly marked.
  • Single-time or time-range analysis: test different sun angles such as morning, noon and afternoon in the same design.
  • Accounts for terrain slope: if topography data is available, shading direction is calculated according to site conditions.
  • Speeds up design decisions: get answers on the drawing within minutes to questions like “Is this row spacing enough?”
  • Pre-PVsyst quality control: reduce shading risks in the layout before moving to detailed production simulation.